Domtar Power Recovery Boiler Chemical Treatment

TESC was engaged by LCI Engineering to execute the work required for the Power and Recovery Boiler Chemical Treatment and Water Treatment Piping Systems at Domtar’s pulp and paper mill in Espanola, Ontario. This project involved lined/chemical piping as well as acid piping renovations.

TESC was responsible for the supply and installation of No. 9 & No. 3 boiler chemical/acid cleaning piping system to TSSA B31.3 Quality Standards. The team also performed the supply and installation of boiler treatment piping. The system installed deionized the water supply for clean operation of the power boiler. This work also included the final connections to mobile treatment units and effective commissioning of the system that was performed in conjunction with Domtar.

The project required approximately 7000 man hours with 16 workers. It was successfully completed on schedule, within the original scope budget, and without injuries.

More Projects

Barrick Hemlo Cyanide Detox Plant & Tailings Flotation Complex
Glencore Onaping Depth Project Headworks Steel Installation
CKPI Installation of Chip Thickness Screening System
Domtar HD Tower Piping
Coniston Generating Station 22kV-44kV Conversion
Mistinikon Lake Replacement of Spillway Guardrails and Flashboards
McVittie Generating Station Roof Replacement
Detour Gold Corporation Detour Lake Mine 13.8kV Substation Installation
Northgate Minerals Young Davidson Mine Substation Installation
BHP Billiton Jansen Mine Freeze Plant Supply Installation
Detour Gold Corporation Detour Lake Mine Concrete Slabs
Northgate Minerals Young Davidson Mine Headframe Construction
BHP Billiton Jansen Mine Hoist House Buildings
Vale No.8 Converter Installation
Sudbury INO Process Gas Project, Phase I
Mosaic K3 Mine Service Shaft Headframe Construction
Vale No.10 Converter Installation
Vale Matte Sep SMPEI Phase 2
Vale Matte Sep SMPEI Phase 1
Harte Gold Sugar Zone Mill Installation SMPEI Project
Tahoe Bell Creek Shaft Sinking Project
Sudbury Lime Plant Electrical Services Installation
Glencore Concentrate Unloading

Our portfolio

Project highlights showcasing TESC’s capabilities, problem solving, and leadership across industries.